T.G FIRE released the test-pipe integrated alarm valve as a 2022 new product.
The test piping and valves normally installed after the alarm valve are fitted during manufacture and pressure-tested before shipment, cutting construction cost, labour and schedule.
Indicating valve + alarm valve + outlet-side branch test piping + test valve and nozzle + gauge valve + pressure gauge are supplied as one package — the job is complete once the inlet and outlet piping is connected.
Left/right orientation and an over-pressure device can also be fully fitted to order.
